ROOF REPLACEMENT AT FIRE STATION 36
In general, the Work includes removing the existing built-up roofing system on all low-slope roof areas and installing a complete new Garland SBS modified bitumen roofing system, including all associated membranes, flashings, cover board, tapered transitions, sheet metal components, walk pads, and a new roof access hatch and curb as shown in the approved drawings.
Addendum #1
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | |||
| Addendum #01_(Issue Date 1-14-26)_FS 36 Roof Replacement | 1.6 MB |